Mastering the Miami-Dade ePermits Portal in 2026: The Complete Guide to Plumbing and Electrical Permits

If you own property, manage a condo, or operate as a contractor in South Florida, understanding how to navigate the Miami-Dade ePermits Portal is no longer optional. In 2026, nearly every construction related process flows through this digital system, especially when dealing with Miami-Dade plumbing and electrical permits.

For homeowners and associations, the portal can feel technical and overwhelming. For professionals, it is a powerful tool when used correctly. This guide walks you step by step through how the system works, what types of plumbing and electrical permits are most common, and how to avoid costly mistakes that delay inspections and approvals.

Miami-Dade County enforces the Florida Building Code rigorously, particularly for life safety systems such as plumbing and electrical installations. Every significant modification to wiring, panels, piping, or gas lines must be permitted and inspected. The official portal can be accessed here.

The system allows property owners and licensed contractors to apply for permits, upload plans, track review comments, pay fees, request inspections, and close permits entirely online.

In 2026, most delays happen not because the work is complex, but because the application was incomplete or submitted incorrectly.

Before logging into the portal, you must determine whether your project requires a permit. Many owners assume minor work is exempt when it is not.

You typically need a plumbing permit for fixture relocations, water heater replacements, drain line modifications, gas line installations, pipe replacements, and bathroom or kitchen remodels that affect supply or waste lines.

You need an electrical permit for panel upgrades, new circuits, rewiring, installation of EV charging stations, major appliance connections, and modifications involving internal wiring.

You can review permit categories and guidance through the Miami-Dade Permitting page:

Cosmetic work such as replacing a faucet without altering piping or swapping a light fixture without new wiring generally does not require permits, but structural or system changes almost always do.

To apply for Miami-Dade plumbing electrical permits, you must create an account within the ePermits portal. Contractors typically use licensed profiles, while owners may register under property records.

Once logged in, you can search for the property using the folio number or address. The portal verifies zoning information and prior permits automatically.

Accurate property data entry is critical. Even small discrepancies in unit numbers or folio references can delay review.

One of the most common mistakes in the Miami-Dade plumbing electrical permits process is selecting the wrong permit category.

For example, replacing a water heater requires a plumbing permit. Installing a new electrical panel requires an electrical permit. Moving a bathroom sink may require both plumbing and possibly structural review depending on scope.

The system provides dropdown categories for electrical, plumbing, mechanical, structural, and combined permits. Selecting the wrong category often results in rejection and resubmission.

Taking the time to review the permit matrix saves weeks of delay.

Plumbing and electrical permits typically require supporting documentation such as contractor licenses, insurance certificates, signed affidavits, product approvals, and sometimes engineered drawings.

All files must be uploaded in the required digital format. Plans must be signed and sealed when required by Florida law. Scanned handwritten signatures are not accepted in most cases.

Incomplete uploads are the primary reason applications are returned for correction.

The Florida Building Code, which governs these requirements, can be reviewed here:

After documentation is uploaded, the system calculates fees based on scope and valuation. Payment is processed online through the portal.

Once submitted, the permit enters review. Plumbing and electrical reviewers examine plans and scope for code compliance. If corrections are required, comments are posted in the portal for response.

Responding quickly and accurately to review comments accelerates approval.

Approval does not complete the process. Once work begins, required inspections must be scheduled through the inspections section of the portal. Inspection scheduling is handled here.

Rough inspections must be completed before walls or ceilings are closed. Final inspections confirm code compliance and allow the permit to be officially closed.

Failure to schedule inspections within required timeframes may cause the permit to expire.

The most frequently requested Miami-Dade plumbing electrical permits related to plumbing include water heater replacements, bathroom renovations, kitchen remodels involving pipe relocation, gas line additions, and cast iron drain replacements.

Cast iron pipe replacement is especially common in older Miami buildings. These projects require detailed scope documentation and inspection coordination to ensure proper installation.

Electrical panel upgrades remain one of the most requested permits due to insurance requirements and modernization efforts. EV charging stations are increasingly common in both residential and condo properties. Rewiring older buildings to meet modern safety standards is also a frequent project.

Each of these requires inspection and final approval to avoid insurance complications or resale delays.

Improperly filed plumbing and electrical permits create ripple effects. Failed inspections cause reinspection fees. Expired permits require reactivation. Open permits delay sales and refinancing.

For condo associations, one unresolved permit in a common area can affect multiple transactions and insurance reviews.

Professional oversight often prevents these problems before they escalate.

Navigating the Miami-Dade ePermits system requires attention to detail and knowledge of compliance standards. For owners and associations, the administrative burden can distract from core responsibilities.

Cosmo Management Group supports clients by handling permit applications, coordinating with licensed contractors, responding to review comments, scheduling inspections, and ensuring final closure. We also address related issues such as open permits, code violations, and compliance gaps.

By managing the process proactively, Cosmo protects property value and prevents administrative errors from turning into financial setbacks.

The Miami-Dade ePermits Portal is an essential tool for managing plumbing and electrical permits in 2026. When used correctly, it streamlines approvals and inspections. When handled incorrectly, it creates delays and risk.

Understanding permit requirements, submitting accurate documentation, and tracking inspections carefully are critical steps in maintaining compliance.

If your property or association needs support navigating Miami-Dade plumbing electrical permits, Cosmo Management Group is here to help. We guide owners and boards through every stage of the permitting process, ensuring projects move forward efficiently and without unnecessary complications.

👉 Do not let permitting errors slow down your project. Connect with Cosmo today and discover how we simplify the Miami-Dade ePermits process, protect your investment, and keep your property compliant.

How do I apply for Miami-Dade plumbing electrical permits
You must register in the ePermits portal, select the correct permit type, upload required documentation, and submit payment.

Do bathroom renovations require plumbing permits in Miami-Dade
Yes, if plumbing lines are modified or relocated.

Are electrical panel upgrades permitted through the ePermits system
Yes, electrical panel replacements require permits and inspections.

Can plumbing and electrical permits delay property sales
Yes, open or expired permits often delay closings and refinancing.

How can Cosmo assist with plumbing and electrical permits
Cosmo manages applications, inspections, compliance coordination, and final closure to prevent delays and reduce risk.